Permit No. 19279 - Feather River West Levee Project: Cilker Irrigation Crossing at Station 1956+20

67 Documents in Project

Summary

SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency (SBFCA)
Document Title
Permit No. 19279 - Feather River West Levee Project: Cilker Irrigation Crossing at Station 1956+20
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2023
Document Description
Approval of Permit No. 19279, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To authorize an existing 36-inch diameter welded steel gravity storm drain pipe crossing, a gate riser with a 36x36-inch sluice gate at the waterside hinge, an inlet structure with headwall on landside toe, and plugged and capped pipe on waterside end.

Contact Information

Name
Jennifer Calles
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Butte
Regions
Northern California
Other Location Info
Located on West Feather River Levee about 1.10 mile north of East Gridley Road, in Butte County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the encroachment permit is available for public review at the Boards office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print