Feather River West Levee Project (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2013-054-02).

67 Documents in Project

Summary

SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency (SBFCA)
Document Title
Feather River West Levee Project (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2013-054-02).
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2013
Document Description
The California Department of Fish and Wildlife is executing Lake or Streambed Alteration Agreement number 1600-2013-0101-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sutter Butte Flood Control Agency. Pacific Gas & Electric (PG&E) must manage a total of 24 PG&E gas and electric utility relocations that conflict with the proposed improvement of the Feather River West Levee. These utilities occur within Reaches 13 through 25 of the Feather River West Levee Contract C. of these utilities, 18 occur in the stream zone (the area from the levee centerline toward Feather River) and require ground disturbance. The remaining utilities either do not occur in the stream zone or do not require ground disturbing work (e.g., lowering existing conductors). No work would occur within waters. All but one of the relocations is to move individual electric transmission or distribution utility poles that conflict with the levee construction or right-of-way. Typical work for electric transmission and distribution consists of temporarily de-energizing facilities, with subsequent removal and relocation of the utility poles to accommodate work on the levee.

Contact Information

Name
Kursten Sheridan
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Biggs, Gridley, Live Oak, Yuba City
Counties
Butte, Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print