Feather River West Levee Project

36 Documents in Project

Summary

SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency
Document Title
Feather River West Levee Project
Document Type
NOD - Notice of Determination
Received

Document Description
Approval of Permits No.: 15565-1 , 15863-1, 12827-1 , 1559-A-1, 3112-1, 7019-1, 12074-1 , 13930-1 , 1398-1, 17977-1, 6016-3, 14420-1 , 19239, 1119-1, 13657-1, 19240, and 19241, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To construct modifications including pressurized storm drain pipes; raw water pipes; gravity irrigation pipe; abandoned pipe; fiber optics cable; and electrical conduit.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

9165740651

Location

Counties
Sutter
Other Location Info
Upstream from Shanghai Bend, 14.83 miles to Campbell Road.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3310 El Camino Avenue, Suite 170, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2011052062   PDF 740 K
Download CSV New Search