Feather River West Levee Project (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2013-054-02).
67 Documents in Project
Summary
SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency
(SBFCA)
Document Title
Feather River West Levee Project (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2013-054-02).
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2015
Document Description
The Sutter Butte Flood Control Agency (SBFCA) is proposing the FRWLP to reduce flood risk in the Sutter Basin, which includes portions of Sutter and Butte Counties in California's Sacramento Valley. The Project includes a combination of cutoff walls and berms (along with other flood management measures).
The Project will result in impacts to 114.729 acres of giant garter snake habitat including temporary impacts to 113.825 acres; the Project will permanently remove 0.904 acres of Giant garter snake habitat. The project is expected to result in incidental take of Giant garter snake, which is/are designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.
Contact Information
Name
Tanya Sheya
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Gridley
Counties
Butte, Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River
Other Location Info
Feather River west levee
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.