Addendum to the Feather River West Levee Project Final EIR

67 Documents in Project

Summary

SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency (SBFCA)
Document Title
Addendum to the Feather River West Levee Project Final EIR
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2015
Document Description
This addendum has been prepared to update the EIR to allow the CDFW to issue an incidental take permit for the FRWLP under Section 2081 of the California Endangered Species Act. The addendum addresses updates to two mitigation measures identified in the FEIR - Mitigation Measure WILD-MM-6: Avoid and Minimize Construction Effects on Giant Garter Snake and Mitigation Measure CR-MM-1: Perform Data Recovery Information Useful in Research. The mitigation measure modifications addressed in the addendum are the following: 1. Additional actions to avoid and minimize construction-related effects on giant garter snake have been added to Mitigation Measure WILD-MM-6: Avoid and Minimize Construction Effects on Giant Garter Snake in response to new information from the U.S. Geological Survey (USGS) regarding how often the snakes utilize burrows during the active season. 2. At the request of the United Auburn Indian Community of the Auburn Rancheria (UAIC), Mitigation Measure CR-MM-1: Perform Data Recovery to Retrieve Information Useful in Research has been modified to include alternative mitigation methods in lieu of data recovery.

Contact Information

Name
Mike Inamine
Agency Name
Sutter Butte Flood Control Agency
Contact Types
Lead/Public Agency

Location

Counties
Butte, Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River
Other Location Info
Feather River west levee

Notice of Determination

Approving Agency
Sutter Butte Flood Control Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print