Feather River West Levee Project (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2013-054-02).

36 Documents in Project

Summary

SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency
Document Title
Feather River West Levee Project (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2013-054-02).
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2015

Document Description
The Sutter Butte Flood Control Agency (SBFCA) is proposing the FRWLP to reduce flood risk in the Sutter Basin, which includes portions of Sutter and Butte Counties in California's Sacramento Valley. The Project includes a combination of cutoff walls and berms (along with other flood management measures). The Project will result in impacts to 125.877 acres of giant garter snake (Thamnophis gigas) habitat including temporary impacts to 125.787 acres; the Project will permanently remove 0.09 acres of Giant garter snake habitat. The project is expected to result in incidental take of Giant garter snake, which is/are designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information
Tanya Sheya
CDFW North Central Region
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

Phone : (916) 358-2953

Location

Coordinates
39°8'25.56"N 121°37'.9624"W
Counties
Butte Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River
Other Location Info
Feather River west levee

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
CDFW North Central Region, 1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search