Feather River West Levee Project (Contract B - PG&E Utilties SAA# 1600-2014-0002-R2)
67 Documents in Project
Summary
SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency
(SBFCA)
Document Title
Feather River West Levee Project (Contract B - PG&E Utilties SAA# 1600-2014-0002-R2)
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2014
Document Description
The California Department of Fish and Wildlife is executing Streambed Alteration Agreement Number 1600-2014-0001-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sutter Butte Flood Control Agency.
this Agreement covers PG&E Utility relocations necessary to accommodate construction in Contract B. Proposed work in Contract B consists of constructing a deep cutoff wall in most of the reaches within the contract, backfilling landside toe depressions, and encroachment management (SAA #1600-2014-0001-R2). In many reach, this work will require a full or partial levee degrade in order to construct the cutoff wall; resulting in a conflict with existing utility locations. To accommodate these improvements PG&E must relocate utilities that area either inconsistent with levee management policies or that would otherwise obstruct construction.
Contact Information
Name
Kursten Sheridan
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Butte, Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River
Other Location Info
Feather River west levee
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.