Feather River West Levee Project (Contract B Levee Improvements SAA# 1600-2014-0001-R2

36 Documents in Project

Summary

SCH Number
2011052062
Lead Agency
Sutter Butte Flood Control Agency
Document Title
Feather River West Levee Project (Contract B Levee Improvements SAA# 1600-2014-0001-R2
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2014

Document Description
The California Department of Fish and Wildlife is executing Streambed Alteration Agreement Number 1600-2014-0001-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sutter Butte Flood Control Agency. The Project consists of degrading the Feather River West Levee to construct a slurry cutoff wall, constructing a deep cutoff wall inside the levee prism wall, backfilling landslide toe depressions, and encroachment management. The cutoff wall would consist of a bentonite (clay) and soil mixture created by excavation of a trench below the levee centerline; the trench would then be filled with the slurry. The levee would then be reconstructed over the wall. Contract D is approximately 11.4 miles in length (60,326 linear feet), and the construction footprint is typically approximately 240 feet wide.

Contact Information
Kursten Sheridan
California Department of Fish and Wildlife
North Central Region 1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

Phone : (916) 358-2950

Location

Coordinates
39°8'25.56"N 121°37'.9624"W
Counties
Butte Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River
Other Location Info
Feather River west levee

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Sutter Butte Flood Control Agency, 1227 Bridge Street, Suite C, Yuba City, CA 95991

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search