Solar Generation Power System at Caltrans' HQ 34th Street Equipment Shop

3 Documents in Project

Summary

SCH Number
2011052056
Lead Agency
Caltrans 3 (Marysville) (California Department of Transportation, District 3)
Document Title
Solar Generation Power System at Caltrans' HQ 34th Street Equipment Shop
Document Type
NOD - Notice of Determination
Received

Document Description
Caltrans proposes to make roof repairs and then install a photovoltaic (PV) power generation system on top of two buildings at their HQ 34th Equipment Shop located at 1805 34th Street in Sacramento, California. This project is part of an overall Pilot project to comply with the Clean Renewable Energy Bonds (CREB) programs and the Governor's Executive Order S-20-04 (which requires state-owned buildings to reduce their grid-based energy by 20% by the year 2015 [baseline 2003]). The work will install PV panels onto the rooftops of the Equipment Shop and the Engineering Office, using either a self-ballasted (counter balancing) system or by drilling holes in the walls and then using supports to affix the PV panels onto the rooftop. Some vegetation removal may be required.

Contact Information
Georgette Neale
California Department of Transportation, District 3
2379 Gateway Oaks Drive, Suite 150
Sacramento, CA 95833

916-274-0623

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
34th Street & Stockton Blvd.
Zip
95816
State Highways
Hwy 16, 50, 99 & SR 51
Railways
Yes
Airports
No
Schools
UC Davis Medical Ctr
Waterways
Sacramento River

Notice of Determination

Approving Agency
California Department of Transportation (Caltrans)
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Sacramento Public Library Central Branch

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No