Knights Landing Outfall Gates Rehabilitation Project

3 Documents in Project

Summary

SCH Number
2011052045
Lead Agency
Water Resources, Department of (California Department of Water Resources)
Document Title
Knights Landing Outfall Gates Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2011
Present Land Use
PP#1: Agriculture and Residential Low

Document Description
The project will replace all gate flaps, seals, and assemblies. Each gate is flanked by concrete wing walls, which when blocked with stop-logs on either side of the structure, can be dewatered. The gate assembly on both sides of the structure will be removed and replaced while facilitating continuous operating of the outfall gates during construction. The project will also repair a crack in the concrete where the abutment and outfall structure meet at bay number 1 on the Sacramento River side of the structure.

Contact Information
Bonnie Green Ross
California Department of Water Resources
Division of Flood Management 3310 El Camino, Rm 140
Sacramento, CA 95821

Phone : (916) 574-0372

Location

Coordinates
38°47'58"N 121°43'30"W
Counties
Yolo
Cross Streets
~0.25 miles on Road 108 West of SR-45
Zip
95645
Parcel #
056-150-16
State Highways
SR 45,113
Waterways
Colusa Basin Drainage Canal & Sac River
Township
11N
Range
2E
Section
14
Base
MDB&M
Other Location Info
City/Nearest Community: Knights Landing

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Yolo Co Clerk of the Board of Supervisors, Woodland, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print