Knights Landing Outfall Gates Rehabilitation Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011052045
- Lead Agency
- California Department of Water Resources (DWR)
- Document Title
- Knights Landing Outfall Gates Rehabilitation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/3/2011
- Present Land Use
- PP#1: Agriculture and Residential Low
- Document Description
- The project will replace all gate flaps, seals, and assemblies. Each gate is flanked by concrete wing walls, which when blocked with stop-logs on either side of the structure, can be dewatered. The gate assembly on both sides of the structure will be removed and replaced while facilitating continuous operating of the outfall gates during construction. The project will also repair a crack in the concrete where the abutment and outfall structure meet at bay number 1 on the Sacramento River side of the structure.
- Contact Information
-
Bonnie Green Ross
California Department of Water Resources
Lead/Public Agency
Division of Flood Management 3310 El Camino, Rm 140
Sacramento, CA 95821
Phone : (916) 574-0372
Location
- Coordinates
- 38°47'58"N 121°43'30"W
- Counties
- Yolo
- Cross Streets
- ~0.25 miles on Road 108 West of SR-45
- Zip
- 95645
- Parcel #
- 056-150-16
- State Highways
- SR 45,113
- Waterways
- Colusa Basin Drainage Canal & Sac River
- Township
- 11N
- Range
- 2E
- Section
- 14
- Base
- MDB&M
- Other Location Info
- City/Nearest Community: Knights Landing
Notice of Determination
- Approving Agency
- Department of Water Resources
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Yolo Co Clerk of the Board of Supervisors, Woodland, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.