Owens Lake Phase 7a Dust Control Measures Project and Own Lake Dust Mitigation Program Phase 9/10 Project

7 Documents in Project

Summary

SCH Number
2011051068
Lead Agency
City of Los Angeles
Document Title
Owens Lake Phase 7a Dust Control Measures Project and Own Lake Dust Mitigation Program Phase 9/10 Project
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2019
Present Land Use
LU: Dust Control, mining, open space, recreation Z: Open Space (OS-40) GPLU: State and Federal Land (SFL)
Document Description
Installation, use, and maintenance of barn owl boxes in Dust Control areas (DCA) T5, T6, T7, and T8; the extended use of sand fences the resignation of 353 acres of managed vegetation dust control measures to sprinkler shallow flooding; the continued use and maintenance of two previously unauthorized access roads in DCA T37-2a (T37-2-L1); installation of flood control system in DCA T2-1b(C2-L1); and the continued use and maintenance of 0.81 acres of previously unauthorized gravel cover in DCA T2-1b (C2-L1) and 1.46 acres in DCA T2-1c (Duck Pond L1). The State Lands Commission action is an amendment to a 20-year General Lease- Public Agency Use through April 30, 2019.

Contact Information

Name
Jennifer Lucchesi
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
Various
Zip
93549
Total Acres
5824
Parcel #
various
State Highways
Hwy 395, SR 136, SR 190
Schools
Olancha ES
Waterways
Owens Dry Lake, Owens River
Section
Variou
Base
MDB&M
Other Location Info
City/Nearest Community: Lone Pine, Olancha, Cartago, Keeler, Swansea Owenslake

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print