Changed Plan (CP) 02-18-5124 - Serrano Summit (Tentative Tract Map 17331) Retaining Walls

15 Documents in Project

Summary

SCH Number
2011051009
Lead Agency
City of Lake Forest
Document Title
Changed Plan (CP) 02-18-5124 - Serrano Summit (Tentative Tract Map 17331) Retaining Walls
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2018
Present Land Use
GPLUD: Medium Density Residential (MDR) with Public Facilities Overlay and Public Facility. The present ZD: Multi-Family Dwelling with a Planned Development Combining District (R2-PD).
Document Description
Changed Plan 02-18-5124 proposes the construction of two Serrano Summit project retaining walls, designated "K" and J2" respectively on the project plans. Wall "K" is proposed along a 420-feet. segment of the westerly property line, adjacent to a planned home owner's association recreation center. The exposed face of Wall K, which will be partially screened by trees planted on the slope, varies in height from 5.6 feet to 18.9 feet; with approx. half of the wall between 15 and 19 feet tall. Wall "J2" is proposed along a 600 feet segment of the southeasterly property line, between future single-family residential and public facility open space. The exposed face of Wall "J2" is approx. 21'-6" at its tallest point. Both walls represent a redesign, including increased height and length of walls previously approved at the approximate same locations via Tentative Tract Map 17331. The revisions are deemed consistent with the scope of a previously approved and evaluated project.

Contact Information

Name
Ron Santos
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency

Location

Cities
Lake Forest
Counties
Orange
Cross Streets
Commercentre Drive & Biscayne Bay Drive
Zip
92630
Total Acres
98.9
Parcel #
104-132-36,-65,-84
State Highways
I-5, I-405
Schools
Fulbright Montessori Academy
Waterways
Serrano Creek
Township
6S
Range
8W
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print