Opportunities Study Area Site #3 (IRWD) - Castellon Residential Project - Use Permit 03-19- 5253

15 Documents in Project

Summary

SCH Number
2011051009
Lead Agency
City of Lake Forest
Document Title
Opportunities Study Area Site #3 (IRWD) - Castellon Residential Project - Use Permit 03-19- 5253
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2019
Document Description
Use Permit 03-19-5253 is a request to develop 51 single-family detached condominium dwelling units in the neighborhood known as "Castellon". The units are designed as "motor court" homes, where each home's attached garage is located off a common alley/drive aisle typically in an eight-unit clustered configuration. The proposal includes a total of 7 court enclaves. Five enclaves are comprised of 8 detached dwelling units and the remaining 2 enclaves are comprised of six and five detached dwelling units respectively. For enhanced architectural curb appeal and a pedestrian-friendly neighborhood, the Plan 4 unit has been designed with the front door elevation oriented along the frontage street, Denali. Pursuant to the approved Serrano Summit Area Plan (Area Plan 2009-01 ), the project requires a Use Permit as it requests minor deviations from the development standards in the Area Plan to reduce the front yard setback on 5 units, reduce the minimum distance between 12 units, and to exceed the rear yard retaining wall/fence height on 6 lots. See NOE for details.

Contact Information

Name
Debbie Drasler
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency

Name
Agency Name
Lennar Homes of CA, Inc.
Contact Types
Project Applicant

Location

Cities
Lake Forest
Counties
Orange
Other Location Info
Generally located south of Commercenter Drive between Serrano Summit Drive and Civic Center Drive in the northerly portion of the Serrano Summit development.

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print