Opportunities Study Area Site #3 (IRWD) - Serrano Summit Entry Modification - Changed Plan 01-19-5244
15 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011051009
- Lead Agency
- Lake Forest, City of (City of Lake Forest)
- Document Title
- Opportunities Study Area Site #3 (IRWD) - Serrano Summit Entry Modification - Changed Plan 01-19-5244
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/1/2019
- Project Applicant
- Lennar Homes of CA, Inc.
- Document Description
- Serrano Summit Drive was approved per the Serrano Summit Area Plan (Area Plan 2009-01) and Tentative Tract Map 17331. Changed Plan 01-19-5244 is an application to modify the street design sidewalk, parkway, and landscaping on Serrano Summit Drive, increase the height of an existing Verdura retaining wall along the easterly side of Serrano Summit Drive, and to construct a new 612 linear-foot Gabion retaining wall along the westerly property line. See NOD for full details.
- Contact Information
-
Debbie Drasler
City of Lake Forest
25550 Commercentre Drive
Lake Forest, CA 92630
Phone : (949) 461-3573
drasler@lakeforestca.gov
Location
- Cities
- Lake Forest
- Counties
- Orange
- Other Location Info
- Generally located south of Commercenter Drive between Serrano Summit Drive and Civic Center Drive in the northerly portion of the Serrano Summit development.
Notice of Determination
- Approving Agency
- City of Lake Forest
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 25550 Commercentre Drive, Suite 100 Lake Forest, CA 92630
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes