Senga Doherty Pump Station Solar Power Project

2 Documents in Project

Summary

SCH Number
2011051006
Lead Agency
Rancho California Water District
Document Title
Senga Doherty Pump Station Solar Power Project
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2011
Present Land Use
CI
Document Description
The project consists of constructing, operating, and maintaining a solar power system, including the following: " Approximately 3,553 high-efficiency (318-watt) SunPower photovoltaic modules, mounted atop SunPower's T-0 tracker array, which consists of concrete and steel pier stanchions. The tracker array follows the sun's path and is controlled by four (4) separate motor control drive systems. " Associated electrical equipment, such as electrical conduits and wire, inverters, switchgears, and transformers on concrete equipment pads. " Approximately 3,650 linear feet of electrical conduit and wire for interconnection of the solar array to the existing Senga Doherty Pump Station. " Security fencing along the solar array and equipment pads. " Site preparation consisting of clearing, grubbing, preparation of the finish grade, and applying hydromulch and other erosion control measures upon the completion of construction. The purpose of the project is to provide clean, renewable electrical power to the existing Senga Doherty Pump Station, thus offsetting the purchase of electricity from the local electric utility company. The project will reduce RCWD's power costs, will reduce RCWD's indirect greenhouse gas emissions, and will reduce RCWD's use of electricity from non-renewable sources.

Contact Information

Name
Andrew L. Webster
Agency Name
Rancho California Water District
Contact Types
Lead/Public Agency

Location

Cities
Murrieta
Counties
Riverside
Cross Streets
Washington Avenue and Cherry Street
Zip
92562
State Highways
I-15
Waterways
Murrieta Creek
Township
7S
Range
3W
Section
34
Base
SBB&M

Notice of Determination

Approving Agency
Rancho California Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes