South Lake Dam Geomembrane Installation Project

Summary

SCH Number
2011048013
Public Agency
Regional Water Quality Control Board, Region 6 (Lahontan), Victorville
Document Title
South Lake Dam Geomembrane Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
4/1/2011
Document Description
The purpose of this project is to install a geomembrane liner on the upstream face of South Lake Dam to mitigate for seepage and extend the effective life span of the structure by up to thirty years. South Lake Dam is a hydroelectric facility regulated under the Federal Energy Commission (FERC). The project does not require an amendment to the exisitng FERC license for the South Lake Dam facility.

Contact Information

Name
Jan M. Zimmerman
Agency Name
Regional Water Quality Control Board, Region 6 (Lahontan), Victo
Contact Types
Lead/Public Agency

Location

Cities
Bishop
Counties
Inyo

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
Existing Facilities fo the inspection and maintenance of an existing public utility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print