Document Description
The project will stabilize an eroding creek bank on Leveroni Creek near Stafford Lake. The eroding bank is now approximately 12 feet from the existing fence and access road that leads to the NMWD Stafford Water Treatment Plant's sludge thickener centrifuge facility. The proposed project will stabilize the eroding bank using a combination of willow-sprigged rock and biotechnical treatments. A rock toe and lower bank rock stabilization structure will be installed along 70 feet of streambank. The design maintains the creek's bankfull width. Rock will be placed to top-of-bank along the upstream 10-foot and downstream 20-foot sections to improve repair stability.

Contact Information

Name
Chris DeGabriele
Agency Name
North Marin Water District
Contact Types
Lead/Public Agency

Location

Cities
Novato
Counties
Marin

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15304, Class 4
Reasons for Exemption
Minor alteration of land that will affect a section of creek bank less than 100 feet long and will not change the character of the environment.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.