Desert Sunlight Solar Farm
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011044003
- Lead Agency
- U.S. Department of Interior, Bureau of Land Management
- Document Title
- Desert Sunlight Solar Farm
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/15/2011
- Present Land Use
- California Desert Conservation Area Plan (1980, as amended). Multiple Use Class M
- Document Description
- The Red Bluff Substation would consist of a 500/220 kV substation on approximately 76 acres, with an additional 96 acres for related features including access roads and drainage control. Substation features would include: connection of the project transmission line into the substation; transmission lines to connect the substation to the DPV1 line; modification of DPV1 towers near the substation; construction of an electric distribution lime for substation light and power; and installation of telecommunications facilities.
- Contact Information
-
Billie Blanchard
California Public Utilities Commission
Lead/Public Agency
505 Van Ness Ave 4th Floor
San Francisco, CA 94102
Phone : (415) 703-2068
Location
- Counties
- Riverside
- Cross Streets
- Kaiser Road
- Zip
- 92239
- Total Acres
- ~4,165
- Parcel #
- multiple
- State Highways
- Hwy 177
- Township
- 4S
- Range
- 15E
- Section
- multip
- Base
- SBB&M
- Other Location Info
- City/Nearest Community: Desert Center
Notice of Determination
- Approving Agency
- California Public Utilities Commission
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.