Stream Alteration Agreement No. 1600-2011-0209-R4 for the Central Valley Independent Network (CVIN) Next Generation Broadband Infrastructure Project.

22 Documents in Project

Summary

SCH Number
2011042097
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Stream Alteration Agreement No. 1600-2011-0209-R4 for the Central Valley Independent Network (CVIN) Next Generation Broadband Infrastructure Project.
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2012
Present Land Use
Various
Document Description
The Project involves developing approximately 817 miles of fiber-based infrastructure. Approximately 723 miles of the proposed route would require new construction. The proposed Project will be limited to areas within the established right-of-way of existing streets but the proposed Project route crosses numerous stream and canals. The project would involve construction of new fiber optic conduit. The conduit would be placed in the ground and later the fiber optic cables would be strung through the conduit via manholes and vaults constructed with the conduit.

Contact Information

Name
Matthew Cohen
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Amador, Calaveras, Colusa, El Dorado, Fresno, Kern, Kings
Other Location Info
City/Nearest Community: Various

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.