El Cerrito Sewer Relief Project

3 Documents in Project

Summary

SCH Number
2011042082
Lead Agency
City of San Mateo
Document Title
El Cerrito Sewer Relief Project
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2015
Present Land Use
The project alignment occurs within existing City Collectors and Locals roadway right-of-way (ROW) & crosses Caltrans ROW.
Document Description
The project is part of the City of San Mateo's overall sewer line alignment project that will increase in size an existing 18-inch sewer line to a 24-inch sewer line approximately 1200 feet long along El Cerrito Avenue and Tilton Avenue to carry sewage flow from the Town of Hillsborough. The overall project also includes construction of a new 27 or 30-inch sewer pipeline approximately 9000 feet long in a new alignment that will ultimately be discharged into the South Trunk sewer system at Idaho Street and Sunnybrea Boulevard. The project covered under the Lake and Streambed Alteration Agreement Number: 1600-2014-0160-R3, CDFW is executing pursuant to Section 1602 Fish and Game Code, is limited to the new pipe alignment crossing at San Mateo Creek at 800 East 3rd Avenue. The pipeline will be installed at the crossing of San Mateo Creek using Pilot Tube Guided Auger Boring construction methods.

Contact Information

Name
Suzanne DeLeon
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Hillsborough, San Mateo
Counties
San Mateo
Cross Streets
El Cerrito/Tilton Avenue, Grant Street, 9th Avenue, & Idaho Street
Zip
94403
State Highways
Hwy 101, SR 82
Railways
Caltrain
Schools
Lawrence, Sunnybrea
Waterways
San Mateo Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print