El Cerrito Relief Line Project
3 Documents in Project
Summary
SCH Number
2011042082
Lead Agency
City of San Mateo
Document Title
El Cerrito Relief Line Project
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2011
Present Land Use
The project alignment occurs within existing City Collectors and Locals roadway right-of-way (ROW) & crosses Caltrans ROW.
Document Description
The project proposes to upsize an existing 18-inch to a 24-inch sewer line approximately 1,200 feet long along El Cerrito Avenue and Tilton Avenue, to carry flow from the Town of Hillsborough. A new 27 or 30-inch sewer pipeline approximately 9,000 feet long will also be constructed in a new alignment that will ultimately be discharged into the South Trunk sewer system at Idaho Street and Sunnybrae Boulevard. The project proposes a dedicated relief line will not connect to other local lines along its alignment.
Contact Information
Name
Martin Quan
Agency Name
City of San Mateo, Department of Public Works
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Hillsborough, San Mateo
Counties
San Mateo
Cross Streets
El Cerrito/Tilton Avenue, Grant Street, 9th Avenue, & Idaho Street
Zip
94403
State Highways
Hwy 101, SR 82
Railways
Caltrain
Schools
Lawrence, Sunnybrea
Waterways
San Mateo Creek
Notice of Determination
Approving Agency
City of San Mateo
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.