ILWU Local 13 Dispatch Hall

4 Documents in Project

Summary

SCH Number
2011041057
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
ILWU Local 13 Dispatch Hall
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2011
Present Land Use
Heavy Manufacturing (M-2)

Document Description
The proposed project involves site preparation activities and construction of a two-storied steel framed 32,565 square foot ILWU Local 13 Dispatch Hall to provide a meeting space and administrative offices for dispatching longshore workers at 1500 E. Anaheim St in Wilmington. The proposed ILWU Local 13 Dispatch Hall would have a total occupancy of 2,962 (2,307 on the dispatch floor). The proposed project would include construction of a dedicated on-site parking lot (812 spaces) with outdoor lighting, which would be enclosed by a 6-foot metal fence and parking lot entrances secured by 6-foot-high rolling gates. As a related project, the proposed project would construct improvements for a future bike path along Alameda and Anaheim Streets.

Contact Information
Lisa Ochsner
City of Los Angeles Harbor Department
Environmental Mgt Division 425 S. Palos Verdes Street
San Pedro, CA 90731

Phone : (310) 732-3412

Location

Cities
Los Angeles Los Angeles, City of
Counties
Los Angeles
Cross Streets
Anaheim Street & Alameda Street
Zip
90731
Total Acres
9
Parcel #
7440-001-912
State Highways
Hwy 103/47, I-110, I-710, I-405
Waterways
East Basin Channel-Los Angeles Harbor
Other Location Info
City/Nearest Community: Wilmington

Notice of Determination

Approving Agency
City of Los Angeles Harbor Department
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Los Angeles Harbor Department Environmental Management Division 425 S. Palos Verdes Street San Pedro, CA 90731

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print