Proposed Relocation of Displaced Threshold, Acquisition of 97 Acres in Fee Simple and Avigation Easement

2 Documents in Project

Summary

SCH Number
2011041055
Lead Agency
Ventura County
Document Title
Proposed Relocation of Displaced Threshold, Acquisition of 97 Acres in Fee Simple and Avigation Easement
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2011
Document Description
Proposed airfield improvements at Oxnard Airport will enhance the safety of airport operations and expand the overall utility and efficiency of the Airport to accommodate existing aircraft operators. Proposed improvements that comprise the proposed project are: relocate the Runway 25 displaced threshold 924 feet to the east and replace nonstandard Medium Intensity Approach Lighting System w/ Runway Alignment Indicator Lights (MALSR) with a standard Medium Intensity Approach Lighting System w/ Sequenced Flashing Lights (MALSF); acquire fee simple ownership of 23.53 acres to the east and north of the current airport boundary; acquire an avigation easement over 62.5 acres north of the Airport generally between the existing northern boundary fence and Teal Club Road.

Contact Information

Name
Todd McNamee
Agency Name
Ventura County Department of Airports
Contact Types
Lead/Public Agency

Location

Cities
Oxnard
Counties
Ventura
Cross Streets
West 5th Street & South Ventura Road
Zip
93030
Total Acres
216
State Highways
Hwy 101
Airports
Oxnard (OXR)
Township
1N
Range
22W
Section
27

Notice of Determination

Approving Agency
County of Ventura Department of Airports
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print