Response Action Plan for 3000 E Imperial Highway

2 Documents in Project

Summary

SCH Number
2011041053
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Response Action Plan for 3000 E Imperial Highway
Document Type
NOD - Notice of Determination
Received

Document Description
" Construction and operation of soil vapor extraction unit (SVE) " Limited excavation and off-site disposal of contaminated soil " Backfilling with clean soil " Project-related vehicle traffic on site The project consists of on-site remediation of soil vapor and soil impacted with VOCs and petroleum hydrocarbons. In addition, limited excavation lead-impacted solid at the Site. SVE with limited exaction and off-site disposal is considered to be a cost-effective treatment alternative capable of meeting the RAOs within a reasonable periods. Additionally, electrical resistive heating (ERH) may be utilized in a approximately 5,000 square foot area in the vicinity of the former USTs to optimize the efficiency of SVE in this area.

Contact Information
Jose Diaz
Department of Toxic Substances Control
Brownfields & Environmental Restoration Programs 9211 Oakdale Avenue
Chatsworth, CA 91311

818-717-6614

Location

Cities
Lynwood
Counties
Los Angeles
Cross Streets
3000 East Imperial Highway
Zip
90262
Total Acres
3.7
Parcel #
6169-003-017
State Highways
Hwy 105
Railways
MTA Blue
Schools
World of Joy, Lincoln ES, Kinder Prep, St. Emydius, Ritter El, I
Waterways
No
Township
3S
Range
W
Section
11
Other Information
School Continued: Ingenium

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
DTSC 9211 Oakdale Avenue Chatsworth, CA 91311

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search