Mariner's Point

3 Documents in Project

Summary

SCH Number
2011041038
Lead Agency
Newport Beach, City of (City of Newport Beach)
Document Title
Mariner's Point
Document Type
NOD - Notice of Determination
Received

Document Description
Demolition of existing building onsite, merging six lots into one parcel, and constructing a 19,905 square-foot commercial/retail building and a three-level, 150 space parking structure. The City Council adopted a resolution approving a general plan Amendment (to increase the allowable floor area ratio (FAR)), Site Plan Review (to exceed the 31-foot height limit), Conditional Use Permit (to allow a parking structure adjacent to a residential zoning district and approve a parking management plan), Variance (to allow structures to encroach five feet into five-foot rear yard setback, and Parcel Map (to merge six lots into one parcel)). The resolution also adopted the Mitigated Negative Declaration (MND) and found the traffic study to be consistent with the City's Traffic Phasing Ordinance.

Contact Information
Jaime Murillo
City of Newport Beach, Planning Department
3300 Newport Boulevard
Newport Beach, CA 92658

(949) 644-3209

Location

Coordinates
33°36'59"N 117°54'28"W
Cities
Newport Beach
Counties
Orange
Cross Streets
West Coast Hwy and Dover Drive
Total Acres
.76
Parcel #
049-280-51,53,55,71,72,73,56,57
State Highways
Hwy 1; SR-55
Schools
Ensign Intermediate School
Waterways
Newport Bay
Township
6S
Range
10W
Section
27

Notice of Determination

Approving Agency
City of Newport
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Newport Beach 3300 Newport Blvd. Newport Beach, CA 92658 Ph: 949-644-3200

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search