Whitewater River - Right bank Levee encroachment Permit and Licensing Agreement

4 Documents in Project

Summary

SCH Number
2011041037
Lead Agency
Cathedral City
Document Title
Whitewater River - Right bank Levee encroachment Permit and Licensing Agreement
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2018
Present Land Use
Cathedral City: Open Space - Water; Resort Residential (3.0 to 6.5 du/ac); Industrial. Palm Springs: Very Low Density Residential (2.1 to 4 du/ac)

Document Description
The project is a licensing agreement between the Riverside County Flood Control and Water Conservation District and the City of Cathedral City. The licensing agreement defines agency responsibilities for construction and maintenance of a 1,065-foot bridge and auxiliary structures over the Whitewater River and the District's Whitewater River - Right Bank Levee. The bridge will replace the existing Cathedral Canyon Drive low water crossing and will not conflict with the levee's function.

Contact Information
Drew Marshall
Riverside County Flood Control and Water Conservation District
1995 Market Street
Riverside, CA 92501

Phone : (951) 955-4643

Location

Coordinates
33°47'41"N 116°27'59.61"W
Cities
Cathedral City
Counties
Riverside
Cross Streets
Cathedral Canyon Drive & Perez Road
Zip
92234
Total Acres
~10
Parcel #
various
State Highways
Hwy 111
Airports
Palm Springs International
Schools
Cathedral ES
Waterways
Whitewater River
Township
4S
Range
5E
Section
28
Base
SBB&M

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search