Hyperion Treation Plant Digester Gas Utilization Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011041032
- Lead Agency
- City of Los Angeles
- Document Title
- Hyperion Treation Plant Digester Gas Utilization Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/12/2013
- Present Land Use
- Wastewater Treatment Plant / Public Facility (PF-1) / Open Space, Public and Quasi-Public Lands
- Document Description
- The City of Los Angeles, Lead Agency, has prepared a DEIR for the proposed project. The City's Bureau of Sanitation (BOS) owns and operates the Hyperion Treatment Plant (HTP), which treats wastewater and biosolids at 12000 Vista del mar in Playa del Rey. Digester gas produced at HTP is treated to remove sulfur and moisture and is piped to Scattergood Generating Station (SGS) under an energy exchange agreement. This arrangement will continue through to 2017. Instead of flaring the gas, the BOS proposes to beneficially use the renewable digester gas in a combined cycle cogeneration system, ensuring that the HTP has reliable electricity and steam for plant use. Two transformers, a substation, and related interconnections will also be installed. Copies of the DEIR are available for public review.
- Contact Information
-
Jim Marchese
City of Los Angeles Public Works Department
Lead/Public Agency
1149 S. Broadway St.
Los Angeles, CA 90015
Phone : (213) 847-5174
Location
- Coordinates
- 33°55'47"N 118°25'54"W
- Cities
- El Segundo
- Counties
- Los Angeles
- Cross Streets
- Vista del Mar at Impreial Highway
- Zip
- 90293
- Total Acres
- 144
- Parcel #
- 4131-029-901
- State Highways
- Rte 1, Rte 105
- Airports
- LAX
- Schools
- 10
- Waterways
- Pacific Ocean
Notice of Determination
- Approving Agency
- City of Los Angeles
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1149 S. Broadway St., 10th Floor Los Angeles CA 90015
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.