South Lake Hillside Dam Geomembrane Installation Project

Summary

SCH Number
2011038168
Lead Agency
Planning and Research, Office of (Office of Planning and Research)
Document Title
South Lake Hillside Dam Geomembrane Installation Project
Document Type
NOE - Notice of Exemption
Received

Document Description
SAA # 1600-2011-0068-R6 Install a geomembrane liner along the upstream face of the dam to block leaks and prevent future leaks. South Lake is drained annually and will not be allowed to refill. A 40 foot wide work area along the entire length of the base of the exposed dam will be utilized. Natural inflow of Bishop Creek will pass through the reservoir and the required flow will be released from the dam. The dam face will be cleaned of loose materials and inspected for any necessary concrete repairs. The geomembrane will then be installed using swingstages and minimal scaffolding. Upon completion of work, the reservoir will be refilled.

Contact Information
Tammy Branston
Department of Fish and Game, Region 6
407 W. Line Street
Bishop, CA 93514

760 872-0751

Location

Counties
Inyo
Other Location Info
South Lake

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
Repair and alterations to an existing dam.