Remedial Action Plan for Landfill E at Presidio of San Francisco

2 Documents in Project

Summary

SCH Number
2011032055
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Remedial Action Plan for Landfill E at Presidio of San Francisco
Document Type
NOD - Notice of Determination
Received

Document Description
Implementation of remedial action that is protective of public health and safety, and the environment. The proposed remedial action consists of placement of a cap for Landfill E. Landfill E operated until sometime between 1965 and 1973. Landfill E is believed to contain soil mixed with building debris (including glass, brick, tile, metal scrap, and other materials), municipal-type solid waste, and chemical waste. The cap is an engineered soil cover. The existing surface soil will serve as a protective cover. In addition, the cover will be designed to allow for adequate surface drainage and monitoring for methane gas.

Contact Information
Denise Tsuji
Department of Toxic Substances Control
Brownfields & Environmental Restoration Program 700 Heinz Avenue
Berkeley, CA 94710

510 540 3824

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Barnard and Quarry
Zip
94129
Total Acres
4.6
State Highways
Hwy 101
Schools
Serra Pre-school, Bay School of SF, Presidio School of Mgt.
Waterways
SF Bay
Township
2S
Range
5W

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Presidio Trust Library 34 Graham Street San Francisco, CA 94129-0052 & DTSC 700 Heinz Avenue Berkeley, CA 94710

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No