Use Permit, Initial Study #2010-077 Sierra Pacific Industries

2 Documents in Project

Summary

SCH Number
2011032048
Lead Agency
Lassen County
Document Title
Use Permit, Initial Study #2010-077 Sierra Pacific Industries
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2011
Present Land Use
U-C-2 (Upland Conservation, Resource Management District), Dyer Mountain Project Area, Westwood/Clear Creek Area Plan
Document Description
Proposed wireless service facility to be located within a 25' x 35' lease area including: 10' x 15' equipment shelter, standby 30 KW diesel generator with a 210 gallon double-wall diesel fuel tank on a 9' x 15' concrete equipment pad, solar panel and mounting frame, 2 power antennas, 1 future 4' M/W dish, and install 2 GPS antennas. All equipment located on the tower (ground mounted rack and structure), including conduit/electrical will be painted a dark brown color. The proposed wireless service facility will have a maximum height of 28.5 feet. Access to the project site will utilize an existing private dirt road.

Contact Information

Name
Maurice L. Anderson
Agency Name
Lassen County Department of Planning & Building Services
Contact Types
Lead/Public Agency

Location

Counties
Lassen
Cross Streets
Summit of Dyer Mountain, 4.5 miles southwest of the community of Westwood
Zip
96130
Total Acres
9
State Highways
Hwy 36
Waterways
Lake Almanor
Other Location Info
City/Nearest Community: Westwood

Notice of Determination

Approving Agency
Lassen County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print