Longleaf Drive Bridge Over Elk Grove Creek
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011032019
- Lead Agency
- City of Elk Grove
- Document Title
- Longleaf Drive Bridge Over Elk Grove Creek
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/1/2011
- Present Land Use
- General Plan Land Use is Public Open Space and Office/Multi-Family. Site is currently undeveloped fields and creek corridor
- Document Description
- The proposed project would construct a two-lane bridge over Elk Grove Creek and associated roadway improvements east of the bridge to Laguna Springs Drive intersection. The proposed project includes modifications to an existing Class I bicycle path on the east side of the creek, as well as some new drainage facilities. The bridge would connect the approved Sutter Elk Grove with Laguna Springs Drive. The proposed project would be built by developers prior to or during construction of such neighboring development. The improvements will require acquisition of right-of-way or easements from parcels: APN 116-1490-003, 116-1490-022, 116-1490-009, 116-1490-010, 116-1480-012, and 116-1480-011.
- Contact Information
-
Jed McLaughlin
City of Elk Grove, Development Services, Planning
Lead/Public Agency
8401 Laguna Palms Way
Elk Grove, CA 95758
Phone : (916) 231-2235
Location
- Coordinates
- 38°25'13"N 121°23'58"W
- Cities
- Elk Grove
- Counties
- Sacramento
- Cross Streets
- Laguna Springs Drive
- Zip
- 95758
- Parcel #
- 116-1490-022, 009, 010; 116-1480-012, 011
- State Highways
- Hwy 99
- Railways
- No
- Airports
- No
- Schools
- Ellen Feickert ES, Elitna Donna ES, Harriett Eddy MS, Lutheran H
- Waterways
- Elk Grove Creek, Laguna Creek, Whitehouse Creek
- Township
- 7N
- Range
- 5E
- Section
- 35
- Base
- MDB&M
Notice of Determination
- Approving Agency
- Elk grove City Council
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Elk Grove 8401 Laguna Palms Way Elk grove, CA 95758
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.