Lyford Drive Multi-Modal Parking Lot Project

2 Documents in Project

Summary

SCH Number
2011032017
Lead Agency
City of Tiburon
Document Title
Lyford Drive Multi-Modal Parking Lot Project
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2011
Present Land Use
Unimproved State Hwy Shoulder/Parks & Recreation
Document Description
The proposed project (as modified upon approval) would construct a new approximately 56-foot wide paved and landscaped parking area within the Tiburon Boulevard (State Route 131) Right of Way and extend onto a portion of the Town's Richardson Bay Lineal Park parcel containing the adjoining Tiburon Multi-Use Path (MUP). The parking lot would provide a total of approximately 45 parking spaces, including a minimum of two oversized spaces for larger vehicles. The parking lot design also specifies a drainage system, irrigation crossover, curb ramps, lighting, utility undergrounding, and landscaping. The project design includes the reconfiguration of the existing sidewalk along the west side of Tiburon Boulevard at Lyford Drive. This area serves as a bus stop and would be expanded into a significantly wider pedestrian-friendly area that would have room for a bus shelter, bicycle racks, and information kiosk.

Contact Information

Name
Scott Anderson
Agency Name
Town Tiburon
Contact Types
Lead/Public Agency

Location

Cities
Tiburon
Counties
Marin
Cross Streets
Tiburon Boulevard & Lyford Drive
Zip
94920
Total Acres
1.1
Parcel #
060-061-15
State Highways
Hwy 131
Schools
Reed & Del Mar Schools
Waterways
Richardson Bay

Notice of Determination

Approving Agency
Town of Tiburon Town Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.