Fire Station 3 Site Acquisition and Construction
6 Documents in Project
Summary
SCH Number
2011031094
Lead Agency
Montecito Fire Protection District
Document Title
Fire Station 3 Site Acquisition and Construction
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2012
Present Land Use
Present Land Use: Lemon Orchards. Zoning: 2-E-1, Estate Residential
Document Description
Acquisition of 2.55 acres and the construction of new fire station and supporting structures totaling approximately 12,560 square feet (sf) to improve service to the Montecito area. Three buildings; a main station of 7,377 sf with apparatus bays, offices, and firefighter residential quarters; a support and training building of 2,301 sf with a hose drying tower of up to 35 feet in height, and maintenance/storage building of 2,882 sf. Non-structural paved surfaces occupying 0.8 acres of the 2.55-acre site with landscaping and restored vegetation covering approximately 1.4 acre of approximately 55% of the site. Access would be available off East Valley Road via two driveways.
Contact Information
Name
Kevin Wallace
Agency Name
Montecito Fire Protection District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Santa Barbara
Cross Streets
East Valley Road/Ortega Ridge Road
Zip
93108
Total Acres
~2.55
Parcel #
155-070-008
State Highways
Hwy 192
Waterways
Romero Creek / Picay Creek
Township
4N
Range
26W
Other Location Info
City/Nearest Community: Montecito
Notice of Determination
Approving Agency
Montecito Fire Protection District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.