Pebbly Beach Road Rockfall Mitigation Project
2 Documents in Project
Summary
SCH Number
2011031043
Lead Agency
City of Avalon
Document Title
Pebbly Beach Road Rockfall Mitigation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/9/2011
Present Land Use
Resort/Recreation & LD Zoning: Low Density/RR
Document Description
The Project involves the Installation of devices to mitigate potential rockfall from the hillsides immediately adjacent to Pebbly Beach Road, including K-rail along the roadway and installation of rockfall draperies on the hillsides. In general, area with rockfall "chutes" will be protected with engineered rockfall barriers. The strength and size of each barrier is dependent on the steepness of the slope and the size of potential boulders. Areas of projecting rock outcroppings will be covered using rockfall draperies. These draperies are made of wire mesh of varying strengths and design depending on the size and nature of the rock slope. In either case, the existing K-rail would be left in place at the base of slopes and extended to include other areas.
Contact Information
Name
Steven Hoefs
Agency Name
City of Avalon
Contact Types
Lead/Public Agency
Phone
Location
Cities
Avalon
Counties
Los Angeles
Cross Streets
Pebbly Beach Road between Cabrillo Mole & Freight Barge Loading Area
Zip
90704
Waterways
Pacific Ocean
Notice of Determination
Approving Agency
City of Avalon
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No