PG&E Crazy Horse Canyon Switching Station and Hollister 115kV Power Line Reconductoring Project (CA Endangered Species Act incidental Take Permit No. 2081-2011-

7 Documents in Project

Summary

SCH Number
2011031027
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
PG&E Crazy Horse Canyon Switching Station and Hollister 115kV Power Line Reconductoring Project (CA Endangered Species Act incidental Take Permit No. 2081-2011-
Document Type
NOD - Notice of Determination
Received
Posted
5/20/2013
Present Land Use
The project site is located within an area classified, zoned, and currently used as grazing lands.
Document Description
The California Department of Fish and Wildlife is executing a Lake or Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Pacific Gas and Electric Company. The applicant proposes to construct a 16-foot-wide permanent asphalt-paved access road with 2-foot-wide shoulders and drainage ditches approximately 750 feet in length from San Juan Grade Road to a switching station. A seasonal wetland (0.025-acres) will be permanently filled with 35 cubic yards of native soil to construct the access road near San Juan Grade Road. Another segment of the access road crosses a drainage feature that will require a 30-inch diameter culvert approximately 120-feet long and lined with a total of 200-square-feet of rip-rap.

Contact Information

Name
Sarah Bahm
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
Monterey
Cross Streets
Crazy Horse Canyon Road and San Juan Grade Road
Zip
93907
Total Acres
~25
Parcel #
199-011-001-000
Schools
Lagunita School
Waterways
Gabilan Creek
Other Location Info
City/Nearest Community: Prunedale

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print