Fresno River Trail System Undercrossings at Schnoor Avenue Bridge
5 Documents in Project
Summary
SCH Number
2011031011
Lead Agency
City of Madera
Document Title
Fresno River Trail System Undercrossings at Schnoor Avenue Bridge
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2011
Present Land Use
Vacant
Z: RCO (Resource Conservation and Open Space)
GP: RC (Resource Conservation)
Document Description
The project proposes the construction of trail undercrossings on both the south and north bank of the Fresno River at the Schnoor Avenue Bridge. Each undercrossing will consists of a concrete pedestrian/bike path, ten feet in width, running into the river bed, under bridge adjacent to bank. The project will connect existing segments of the Vern McCullough Fresno River Trail. The improvements will facilitate safer connection/access to the existing trail, where currently trail users must cross four lanes of traffic or use unimproved dirt paths under either side of bridge to continue on trail system. The project is proposed in two phases. Phase 1 would construct the southerly undercrossing. Phase 2 would construct the northerly undercrossing.
Contact Information
Name
Steve Greer
Agency Name
City of Madera
Contact Types
Lead/Public Agency
Phone
Location
Cities
Madera
Counties
Madera
Cross Streets
Schnoor Ave. & Trevor Way
Zip
93637
Total Acres
~ 2
State Highways
Hwy 99
Railways
UPRR
Airports
Madera Municipal
Schools
Madera Unified School District
Waterways
Fresno River
Notice of Determination
Approving Agency
City of Madera
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.