IEUA RP-1 Fuel Cell Plant Project

Summary

SCH Number
2011028102
Lead Agency
Inland Empire Utilities Agency (Inland Empire Utility Agency)
Document Title
IEUA RP-1 Fuel Cell Plant Project
Document Type
NOE - Notice of Exemption
Received
Posted
2/14/2011

Document Description
Under this proposed project a 2.8 megawatt (MW) fuel cell system will be installed at the RP-1 treatment plant between the existing Energy Recovery Building and the Blower Building. IEUA will supply the digester gas and supplemental natural gas required for fuel cell operation at full load. Heat recovery generated by the fuel cell will be used for process digester heating. As part of the project, a gas treatment system will be installed to treat and clean the digester gas before it is used in the proposed fuel cell. Because of the heat recovery associated with this project, it is considered to be a "cogeneration project."

Contact Information
Thomas Love
Inland Empire Utility Agency
6075 Kimball Avenue
Chino, CA 91710

Phone : (909) 993-1600

Location

Cities
Ontario
Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
21084; 15329
Reasons for Exemption
No potential to cause significant adverse effect on the environment and will ensure that future energy used at the RP-1 WRF will generate minimal criteria and greenhouse emissions, and the WRF will be more energy independent in the future.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.