Document Description
Under this proposed project a 2.8 megawatt (MW) fuel cell system will be installed at the RP-1 treatment plant between the existing Energy Recovery Building and the Blower Building. IEUA will supply the digester gas and supplemental natural gas required for fuel cell operation at full load. Heat recovery generated by the fuel cell will be used for process digester heating. As part of the project, a gas treatment system will be installed to treat and clean the digester gas before it is used in the proposed fuel cell. Because of the heat recovery associated with this project, it is considered to be a "cogeneration project."
Contact Information
Name
Thomas Love
Agency Name
Inland Empire Utility Agency
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ontario
Counties
San Bernardino
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
21084; 15329
Reasons for Exemption
No potential to cause significant adverse effect on the environment and will ensure that future energy used at the RP-1 WRF will generate minimal criteria and greenhouse emissions, and the WRF will be more energy independent in the future.