Solar/Photovoltaic System Installation Project

Summary

SCH Number
2011028063
Public Agency
Glendale Unified School District
Document Title
Solar/Photovoltaic System Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
2/10/2011
Document Description
The project will entail installation of photovoltaic system on carport structures and other shade providing structures on the school premises. The project is sized so that the maximum generation on an annual basis does not exceed 70% of the electricity presently consumed by the school site. The overall project includes one or more new structures such as carports, PV modules, inverters, disconnects and interconnection equipment that conforms to the utility required interconnection standards and DSA required safety, access, and fire life safety standards.

Contact Information

Name
Eva Lueck
Agency Name
Glendale Unified School District
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Other Location Info
La Crescenta

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303, Class 3
Reasons for Exemption
Construction and installation of limited numbers of new small structures, including accessory structures such as garages and carports.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.