Conditional Waiver of WDRs for the Land Application of EQ Classified Biosolids Derived Compost Material as a Soil Amendment

2 Documents in Project

Summary

SCH Number
2011022062
Lead Agency
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa
Document Title
Conditional Waiver of WDRs for the Land Application of EQ Classified Biosolids Derived Compost Material as a Soil Amendment
Document Type
NOD - Notice of Determination
Received

Document Description
The land application of Exceptional Quality (EQ) classified biosolids derived compost material as a soil amendment to agricultural lands as described in the City of Fortuna Waste Water Treatment Facility (WWTF) August 2010 Biosolids Management Plan (Management Plan). The City of Fortuna Municipal WWTF is located at 180 Dinsmore Drive in Fortuna. The 12 potential agricultural land application sites are located outside of the City of Fortuna boundary within Humboldt County.

Contact Information
Rachel Prat
Regional Water Quality Control Board, Region 1 (North Coast), Sa
5550 Skylane Boulevard, Suite A
Santa Rosa, CA 95403

(707) 576-2542

Location

Cities
Fortuna
Counties
Humboldt
Cross Streets
See Figure 1 Land Application Sites
Zip
95540
Total Acres
278.24
Parcel #
See Figure 1 Land Application Sites
State Highways
Hwy 36, 101
Railways
Northwestern Pacific RR
Airports
Rohnerville Airport
Schools
Fortuna, Rohnerville and Hydesville
Waterways
Eel River
Township
2N
Range
1W&E
Base
HB&M

Notice of Determination

Approving Agency
North Coast Regional Water Control Board
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
5550 Skylane Blvd., Suite A Santa Rosa, Ca 95403

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search