Amendment to Oakland Zoo Master Plan

8 Documents in Project

Summary

SCH Number
2011022042
Lead Agency
Oakland, City of (City of Oakland)
Document Title
Amendment to Oakland Zoo Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2011
Present Land Use
Zoning = OS-SU (Open Space - Special use); General Plan Designation = Urban Open Space

Document Description
Amendment to the previously approved 1998 Master Plan for the Oakland Zoo to, among other changes, modify and reduce the expansion area for the new California exhibit from ~62 acres to ~56 acres, replace the previously approved loop road and shuttle bus system with an electric aerial gondola system, replace the existing veterinary hospital with a new Veterinary Medical Hospital, establish a new overnight camping area near the new California exhibit, and establish the specific location of the proposed perimeter fence with modification from the previously approved general location.

Contact Information
Darin Ranelletti
City of Oakland
Community & Economic Development Agency, Planning & Zoning Div. 250 Frank H. Ogawa Plaza, Suite 3315
Oakland, CA 94612

Phone : (510) 238-3663

Location

Cities
Oakland
Counties
Alameda
Cross Streets
Golf Links Road @ I-580
Zip
94605
Total Acres
~56
State Highways
I-580
Schools
Marshall; Bshp O'Dowd
Waterways
Arroyo Viejo Creek

Notice of Determination

Approving Agency
Oakland City Council
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Comm. & Econ. Dev. Div. Planning and Zon. Div. 250 Frank H Ogawa Plaza, Suite 3315 Oakland, CA 94612

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print