Water Diversion (PC-4C) in Potter Creek

3 Documents in Project

Summary

SCH Number
2011022035
Lead Agency
Stockton East Water District
Document Title
Water Diversion (PC-4C) in Potter Creek
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2011
Present Land Use
Present Land Use: Agricultural Zoning: AG-40 General Plan Designation: A/G
Document Description
The CA DFG is executing Lake or Streambed Alteration Agreement number 1600-2011-0078-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, P&M Farms. The project is limited to construction of a 4 sf by 16 foot tall concrete sump and installation of a 16 foot long, 24 inch diameter pipe to allow for diversion of water purchased from Stockton East Water District conveyed through Potter Creek. The project will result in removal of ~27 cubic yards of material from the bed and bank of Potter Creek and subsequent placement of ~6 cubic yards limestone rip rap over the top of the sump and the disturbed areas of creek bank. All work is planned for times of no flow in the creek.

Contact Information

Name
Robert C. Hosea
Agency Name
DFG
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin
Cross Streets
E. Milton Rd.
Zip
95236
Total Acres
.006
Parcel #
105-200-04
State Highways
No
Railways
No
Airports
No
Schools
Everett School
Waterways
Mormon Slough, Potter Creek
Township
2N
Range
8E
Section
26
Other Location Info
City/Nearest Community: Linden

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print