Machado Water Diversion (PC-4C) in Potter Creek
3 Documents in Project
Summary
SCH Number
2011022035
Lead Agency
Stockton East Water District
Document Title
Machado Water Diversion (PC-4C) in Potter Creek
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2011
Present Land Use
Present Land Use: Agricultural
Zoning: AG-40
General Plan Designation: A/G
Document Description
Construction of a new surface water diversion in Potter Creek for the purpose of irrigating agricultural lands adjacent to the creek. Construction will occur during a non-flow period for the creek and consist of disturbing about 27-cubic yards of streambed and bank necessary to install a sump and pipeline for the water diversion. Once construction in the channel is complete and the disturbed areas restored, a pump capable of conveying 1,200 gallons per minute (gpm) of surface water will be installed on the sump. Similar diversions exists up and downstream of this location. The cost of piping water from these existing diversions (as an alternative) was deemed uneconomical due to the distance between such diversions.
Contact Information
Name
Andres Lozano
Agency Name
Stockton East Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Joaquin
Cross Streets
E. Milton Rd.
Zip
95236
Total Acres
.006
Parcel #
105-200-04
State Highways
No
Railways
No
Airports
No
Schools
Everett School
Waterways
Mormon Slough, Potter Creek
Township
2N
Range
8E
Section
26
Other Location Info
City/Nearest Community: Linden
Notice of Determination
Approving Agency
Stockton East Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.