Machado Water Diversion (PC-4C) in Potter Creek

3 Documents in Project

Summary

SCH Number
2011022035
Lead Agency
Stockton East Water District
Document Title
Machado Water Diversion (PC-4C) in Potter Creek
Document Type
NEG - Negative Declaration
Received
Present Land Use
Present Land Use: Agricultural Zoning: AG-40 General Plan Designation: A/G
Document Description
Construction of a new surface water diversion in Potter Creek for the purpose of irrigating agricultural lands adjacent to the creek. Construction will occur during a non-flow period for the creek and consist of disturbing about 27-cubic yards of streambed and bank necessary to install a sump and pipeline for the water diversion. Once construction in the channel is complete and the disturbed areas restored, a pump capable of conveying 1,200 gallons per minute (gpm) of surface water will be installed on the sump. Similar diversions exists up and downstream of this location. The cost of piping water from these existing diversions (as an alternative) was deemed uneconomical due to the distance between such diversions.

Contact Information

Name
Andres Lozano
Agency Name
Stockton East Water District
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin
Cross Streets
E. Milton Rd.
Zip
95236
Total Acres
.006
Parcel #
105-200-04
State Highways
No
Railways
No
Airports
No
Schools
Everett School
Waterways
Mormon Slough, Potter Creek
Township
2N
Range
8E
Section
26
Other Location Info
City/Nearest Community: Linden

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Rights
State Reviewing Agency Comments
State Water Resources Control Board, Division of Water Rights
Development Types
Other (Ag. Pump Installation)
Local Actions
Site Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print