Sewer Master Plan
3 Documents in Project
Summary
SCH Number
2011021026
Lead Agency
Big Bear Area Regional Wastewater Agency
(BBARWA)
Document Title
Sewer Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2011
Document Description
BBARWA's existing Long Range Facilities Plan (Sewer Master Plan) was adopted in 2000. The Agency has compiled an updated Sewer Master Plan which identifies current system deficiencies, and determines the long-term system requirements through Year 2030. The updated Sewer Master Plan was prepared by Engineering Resources of Southern CA.
In order to complete the proposed Sewer Master Plan update, a sewer flow model was used to analyze deficiencies of the existing interceptor and treatment system and also to project future sewer flows. Recommendations for capital improvements to meet the facilities needs of existing and projected sewer flows were made based on the sewer flow modeling. The proposed Sewer Master Plan would serve as a guide for future system development and capital planning for future sewer system requirements.
Contact Information
Name
Steven Schindler
Agency Name
Big Bear Area Regional Wastewater Agency
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Bernardino
Zip
92314
Total Acres
~79,000
State Highways
Hwy 38
Waterways
Big Bear Lake
Other Location Info
City/Nearest Community: Big Bear Valley
Notice of Determination
Approving Agency
BBARWA
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.