Agreement 1600-2011-0065-R4 - Cuesta College Sewer Replacement Project

2 Documents in Project

Summary

SCH Number
2011021016
Lead Agency
Cuesta College
Document Title
Agreement 1600-2011-0065-R4 - Cuesta College Sewer Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2011
Present Land Use
Public Facilities
Document Description
The California Department of Fish and Game is executing a lake and Streambed Alteration pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Cuesta College. The Project consists of the following: As part of an upgrade to the Cuesta College Sewer system, a new free-span steel truss bridge will be constructed to support a 10-inch gravity sewer line. This bridge will be located between the old sewer bridge and an existing recycled water pipe bridge. Construction of the new truss bridge will require installation of concrete abutments and pilings on both sides of Chorro Creek. An existing 8-inch recycled water pipeline that crosses Chorro Creek will be realigned to the above described areas will be revegetated by planting native shrubs and hydro-seeding the area with a native plant seed mix.

Contact Information

Name
Julie Means
Agency Name
DFG, Central Region
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Hwy 1 / Education Drive
Zip
93403
Total Acres
5
Parcel #
073-221-012, 028, 067-051-006
State Highways
Hwy 1
Airports
Camp SLO Airfield
Schools
Cuesta College
Waterways
Pennington and Chorro Creeks
Township
30S
Range
11E
Section
12
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print