Amendment to the Water Quality Control Plan for the San Francisco Bay Basin (Basin Plan) to Establish a Total Maximum Daily Load (TMDL) for Sediment in the Napa

Summary

SCH Number
2011019003
Lead Agency
Regional Water Quality Control Board, Region 2 (San Francisco Bay), Oakland
Document Title
Amendment to the Water Quality Control Plan for the San Francisco Bay Basin (Basin Plan) to Establish a Total Maximum Daily Load (TMDL) for Sediment in the Napa
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2011
Document Description
Project Title cont: River, and an Implementation Plan to Achieve the TMDL and Related Habitat Enhancement Goals The project is a Basin Plan amendment to establish to a TMDL and an implementation plan to achieve the TMDL and related habitat enhancement goals. The Regional Water Board is obligated under Section 303(d) of the federal Clean Water Act to develop a TMDL for the Napa River to address sediment impairment. The Basin Plan Amendment includes: (a) numeric targets for sediment that protect water quality; (b) a total maximum daily load for sediment in the Napa River; (c) allocations for all significant sediment source categories; and (d) an implementation plan to achieve the TMDL and related habitat goals (e.g., habitat complexity, baseflow, fish passage, and stream temperature); and (e) a statement of evaluation and monitoring that will be conducted to gauge progress toward meeting the targets and goals.

Contact Information

Name
Mike Napolitano
Agency Name
Regional Water Quality Control Board, Region 2 (San Francisco Ba
Contact Types
Lead/Public Agency

Location


Notice of Determination

Approving Agency
Regional Water Board
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.