Antelope Area Sewer Project

Summary

SCH Number
2011012082
Lead Agency
Antelope Sewer Authority
Document Title
Antelope Area Sewer Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Land Use: Areas immediately to the north and south of Antelope Boulevard east of Trinity Avenue as General Commercial with a portion of that area being General Industrial near the intersection with State Highway 36. The western portion of the project area is predominantly identified by the Tehama County General Plan as Suburban Residential, except the County Fair Grounds and the Antelope and Berrendos Schools, which are designated Public facility. Zoning Tehama County: R-1, Single Family Residence, RE, Residential Estate. RE-B-10 Residential Estates, 3 ac min, RE-T-B-10, Residential Estate, Trailers allowed, 3 ac min, RE-BZ, General Commercial, C3-SP, General Commercial with Special Highway Frontage, M1-5, Light Industrial with Special Highway Frontage, PD, Planned Development and PA, Public Agency and School. Zoning Red Bluff: R-1, Single Family Residence, R-3, Neighborhood Apartment, C-2, Central Business, C-3, General Commercial and M-1, Light Industrial.

Document Description
Project involves the construction of approximately 105,000 lineal feet (LF) of sewer line and laterals, at least six lift stations, and approximately 1,250 service connections. Under one option being considered, the project could include an additional life station and directional drilling under the Sacramento River to connect sanitary sewer mains to the City of Red Bluff Waste Water Reclamation Plant.

Contact Information
Gary Antone
Antelope Sewer Authority
727 Oak Street
Red Bluff, CA 96080

Phone : (530) 385-1462

Location

Coordinates
40°11'10.08"N 122°12'35.70"W
Cities
Anderson
Counties
Tehama
Cross Streets
East of I-5, along Antelope Blvd (SR 36/99) & unincorporated land east of I-5 & Sacramento River
Zip
96080
Total Acres
1,211
Parcel #
Various
State Highways
I-5, Hwy 36 & Hwy 99
Airports
Red Bluff
Schools
Antelope and Berrendos
Waterways
Sacramento River
Township
27N
Range
3W
Section
9, 14-
Other Information
Continue Section: 17, 21-23, 28, 29

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Sewer collection, 105,000 linear feet (LF) sewer lines) Waste Treatment:Other (MGD 2.5)
Project Issues
Air Quality Archaeologic-Historic Biological Resources Flood Plain/Flooding Geologic/Seismic Noise Public Services Sewer Capacity Soil Erosion/Compaction/Grading Toxic/Hazardous Vegetation Water Quality Wetland/Riparian Wildlife Growth Inducing Cumulative Effects
Reviewing Agencies
Air Resources Board, Major Industrial Projects California Department of Conservation California Department of Fish and Wildlife, Northern Region 1 California Department of Parks and Recreation California Department of Public Health California Department of Transportation, District 2 California Highway Patrol California Regional Water Quality Control Board, Central Valley Redding Region 5 California State Lands Commission Caltrans, Division of Aeronautics Department of Toxic Substances Control Resources Agency Resources, Recycling and Recovery State Water Resources Control Board, Division of Water Rights California Native American Heritage Commission Central Valley Flood Protection Board

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print