Douglas Flat/Vallecito Wastewater Facility Upgrade (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5249-110

3 Documents in Project

Summary

SCH Number
2011012078
Lead Agency
Calaveras County Water District (CCWD)
Document Title
Douglas Flat/Vallecito Wastewater Facility Upgrade (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5249-110
Document Type
NOD - Notice of Determination
Received
Posted
11/4/2011
Present Land Use
Public Service (PS)
Document Description
The Project will upgrade and expand the WWTP to meet new Waste Discharge Requirements and other regulatory requirements, and provide sufficient capacity for peak flows. The Project will involve installing an 86,500 gallon per day packaged membrane bioreactor (MBR) process that is capable producing tertiary treated effluent. The tertiary treatment will allow for potential future beneficial reuse of effluent by local vineyards and prevent over applying effluent to the existing disposal spray fields. The Project will also involve converting an existing basin into a covered flow equalization basin; installation a grit removal unit, rotary screen, flow equalization tank, supplemental aeration tank, an MBR tank, a sludge holding tank, ultraviolet disinfection, a belt filter press, and a standby emergency generator; and upgrading an existing septic tank effluent receiving station.

Contact Information

Name
Lisa Lee
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
1901 Holiday Mine Road off State Route 4
Zip
95229
Total Acres
4-acre parcel
Parcel #
066-040-001
State Highways
Route 4
Schools
Albert Michelson ES
Waterways
Coyote Creek
Township
3N
Range
14E
Section
17
Base
MDB&M
Other Location Info
City/Nearest Community: Douglas Flat

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.