Center Street Water Main Project

2 Documents in Project

Summary

SCH Number
2011012066
Lead Agency
Dorris, City of (City of Dorris)
Document Title
Center Street Water Main Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project is located adjacent to the east City limit of the City of Dorris, Siskiyou County, CA. It consists of connecting to an existing 10" diameter water main just North of State Highway 97 and extending it southerly to the South side of State Route 97. Construction will be primarily within the roadway and consist of sawcutting the existing asphalt concrete surface and excavating a trench approximately 3 feet in width and 4' in depth across the highway. The 10" diameter pvc water main will then be placed in the trench and backfilled. Backfilled will consist of Caltrans Standard 1 sack slurry up to three inches below finish grade with 3" of asphalt concrete to bring the trench back to finish grade. There new water main will require new concrete thrust blocks restraints at new ell and tee locations. Excavations for these thrust blocks will be somewhat sorted and disposed of offsite. Native material will be disposed of on City property and asphalt concrete material will be properly disposed of offsite at a suitable location according to the laws and regulations of the State of California.

Contact Information
Jim Bray
City of Dorris
P.O. Box 768
Dorris, CA 96023

(530) 842-6813

Location

Coordinates
41°58'02"N 121°54'41"W
Cities
Dorris
Counties
Siskiyou
Cross Streets
Center Street
Zip
96023
State Highways
Hwy 97
Railways
Union Pacific RR
Schools
Butte Valley Unified

Notice of Determination

Approving Agency
Dorris City Council
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes