DG Fairhaven Power, LLC Coastal Development Permit; Application Number 8583 Case Number CDP 14-009

3 Documents in Project

Summary

SCH Number
2011012056
Lead Agency
Humboldt County
Document Title
DG Fairhaven Power, LLC Coastal Development Permit; Application Number 8583 Case Number CDP 14-009
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2014
Present Land Use
Industrial/General (MG)
Document Description
The project is located to modify an existing stormwater drainage/infiltration ditch such that all storm water from the DG Fairhaven facility will infiltrate onsite and none will discharge offsite. A stormwater basin will be created, sized to hold all runoff from a 100-year, 5-minute storm, with no allowance for infiltration. This involves grading an area consisting of approximately 8,000 square feet (0.2 acres) resulting in an approximate 580 cubic yard cut, approximate 69 cubic yard fill, and approximate 511 cubic yards of material to be exported.

Contact Information

Name
Michael Wheeler
Agency Name
County of Humboldt Planning and Building Department
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
New Navy Base Road and Bay Street
Zip
95501
Parcel #
401-121-12
State Highways
Hwy 255
Railways
North Western Pacific
Airports
Murray Field
Schools
Samoa ES
Waterways
Humboldt Bay
Township
5N
Range
1W
Section
20
Base
HB&M
Other Location Info
City/Nearest Community: Samoa

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print